Blog: Electrical Planning Checklist Before Breaking Ground 

Breaking ground on a commercial project is an exciting milestone, but it should never be the starting point for electrical decision-making. Long before excavation begins, builders and developers must complete detailed electrical coordination to ensure safety, efficiency, scalability, and code compliance. Thorough electrical planning for commercial construction prevents costly change orders, inspection failures, and delays that can derail schedules and budgets. 

Whether you’re developing an office complex, retail center, industrial facility, or mixed-use property, a structured pre-construction electrical checklist helps align engineers, contractors, utilities, and inspectors before physical work starts. This guide outlines a practical, step-by-step approach to service sizing, conduit layout, lighting design, EV readiness, and inspection planning—organized into two comprehensive checklist sections, with deeper context provided throughout. 

 Pre-Construction Electrical Design & Infrastructure Checklist

Before breaking ground, complete the following foundational planning steps: 

  • Define building occupancy type and projected operational demands 
  • Perform detailed commercial load calculations including HVAC, lighting, receptacles, elevators, IT rooms, kitchen equipment, and specialty systems 
  • Confirm required service voltage and available utility capacity 
  • Coordinate early with the local utility provider regarding transformer placement, metering, easements, and lead times 
  • Determine service entrance location and size main switchgear accordingly 
  • Allocate adequate electrical room space with required NEC working clearances 
  • Design panelboards, transformers, and distribution systems with future expansion capacity 
  • Develop grounding, bonding, and surge protection strategies 
  • Plan standby or emergency power systems if required by occupancy type 
  • Create comprehensive lighting plans, including energy code compliance and emergency egress lighting 
  • Design underground conduit routing and slab stub-ups prior to excavation 
  • Separate power and low-voltage pathways for efficiency and interference prevention 
  • Coordinate fire alarm, security, access control, and building automation systems 
  • Evaluate EV charging requirements and reserve panel capacity and conduit for future growth 
  • Review NEC planning guidance and confirm local amendments 
  • Submit electrical drawings and documentation for permitting approval 

 

Strong electrical infrastructure begins with accurate commercial load calculations. These calculations determine how much power the building will require not only on day one but years into the future. They account for connected loads, demand factors, diversity factors, continuous load adjustments, and projected tenant needs. Undersizing service can result in overload risks and expensive upgrades, while oversizing can unnecessarily inflate capital costs. A balanced, code-compliant load study is essential for reliable performance and long-term scalability. 

Utility coordination must happen early, often months before construction mobilization. Transformer procurement, service approval, and metering design frequently involve extended timelines. Developers who wait too long to engage the utility provider risk significant schedule delays. Early communication ensures voltage availability, proper transformer placement, and alignment with utility easements and site planning. 

Service entrance and electrical room layout require careful space planning. Commercial equipment demands strict working clearances and ventilation requirements. Crowded electrical rooms create maintenance challenges and potential code violations. Planning for 20–30% expansion capacity protects long-term asset value and allows for tenant growth without major infrastructure overhauls. 

Conduit layout is another critical early decision. Underground routing, slab penetrations, and riser pathways must be finalized before concrete is poured. Installing spare conduits during pre-construction is far more cost-effective than coring slabs later. Proper conduit planning also reduces clashes with plumbing, structural steel, and HVAC systems. 

Lighting design extends beyond fixture selection. Illumination levels must meet occupancy standards while complying with energy codes. LED systems, daylight harvesting controls, occupancy sensors, and emergency lighting should all be integrated during early planning. Well-designed lighting improves safety, enhances tenant satisfaction, and reduces operational expenses over time. 

EV readiness has become a central component of modern commercial developments. Many jurisdictions now require EV-capable parking infrastructure. Even where not mandated, developers benefit from installing conduit pathways and reserving electrical capacity for future chargers. Retrofitting EV systems after occupancy can be significantly more disruptive and expensive. 

For projects seeking seamless integration between design and execution, consider working with a unified delivery partner through our New Construction Services.Early collaboration reduces miscommunication, improves cost forecasting, and streamlines scheduling. 

 Construction Sequencing, Inspection & Future-Proofing Checklist

Once plans are approved and equipment is specified, execution must follow a structured timeline: 

  • Confirm underground conduit routing before trenching and excavation 
  • Schedule underground rough inspection prior to backfilling 
  • Verify grounding electrode installation during foundation work 
  • Inspect slab conduit placement before concrete pours 
  • Coordinate transformer pads and generator equipment foundations 
  • Install service gear with required working clearances 
  • Schedule rough-in inspection before wall closure 
  • Conduct above-ceiling inspection prior to ceiling installation 
  • Install and test lighting control systems and emergency lighting 
  • Complete generator and automatic transfer switch testing if applicable 
  • Coordinate utility release inspection and meter installation 
  • Secure final electrical inspection approval 
  • Obtain certificate of occupancy clearance 
  • Document as-built drawings and updated panel schedules 
  • Reserve spare circuits and conduit pathways for future expansion 

 

Inspection timelines are often underestimated during project scheduling. Electrical inspections typically occur in multiple phases: underground rough, slab, rough-in, above-ceiling, and final. Missing inspection windows can stall construction progress for days or even weeks. Builders should consult local City permitting resources early to understand submission requirements and scheduling lead times. 

Grounding systems and surge protection must be verified during early inspections. Proper bonding ensures safety and protects sensitive electronic equipment from voltage fluctuations. Surge protection devices are increasingly required in commercial applications and should be included in the design stage. 

Backup power systems add another layer of complexity. Healthcare facilities, data centers, and certain commercial occupancies require standby or emergency power. Generator procurement often involves long lead times, sometimes exceeding six months. Planning for fuel storage, ventilation, and automatic transfer switches early prevents bottlenecks later. 

Coordination between trades remains essential throughout construction. Electrical systems intersect with plumbing, fire suppression, HVAC ductwork, and structural framing. Pre-construction meetings and BIM clash detection can prevent costly field modifications. Clear communication ensures conduit pathways, panel placements, and ceiling clearances align with architectural intent. 

Future-proofing strategies should not be an afterthought. Commercial buildings must adapt to technological evolution, electrification trends, and tenant turnover. Oversizing switchgear moderately, installing spare raceways, and leaving panel capacity for additional circuits can dramatically reduce renovation costs later. 

For integrated project delivery that minimizes change orders and enhances efficiency, explore our Electric Installation Page to see how coordinated planning improves both performance and profitability. 

Code Compliance and NEC Edition Verification

Complying with current code standards is non-negotiable. Builders should reference the latest NEC planning guidance to confirm compliance with service sizing, grounding requirements, arc-fault protection, and energy efficiency standards. It is also important to verify which NEC edition has been adopted by the local jurisdiction, as amendments can vary significantly by municipality. 

Electrical systems form the backbone of every commercial building. They power HVAC systems, lighting, security, communications, and increasingly, electric vehicle infrastructure. Without thorough electrical planning for commercial construction, projects risk operational inefficiencies and safety concerns that could persist long after ribbon-cutting. 

A well-structured pre-construction electrical checklist aligns engineers, contractors, and inspectors before any concrete is poured. Accurate commercial load calculations, early utility coordination, well-planned conduit layouts, detailed lighting strategies, and clearly defined inspection timelines create a stable foundation for the entire project. 

Final Checklist Before Breaking Ground

Before breaking ground, confirm that service sizing is finalized, conduit routing is mapped, EV readiness is accounted for, inspections are scheduled, and long-lead equipment is ordered. When electrical systems are thoughtfully planned and sequenced, construction progresses smoothly—and the building is positioned for long-term performance, safety, and adaptability. 

Breaking ground should represent confidence, not uncertainty. With the right electrical planning strategy in place, developers can move forward knowing their investment is powered for success. 

Learn more about our capabilities on our Commercial Services page. 

Ready to discuss your next project? Contact our team today: (561) 295-8483 

Request Service

Contact our Service Champions today for your electrical solution.
Kasper Electrical Logo

Request Service

Fill out the form below, and we will be in touch shortly.
Contact Information
Electrical Service Needed:* (choose)
Preferred Date and Time Selection